In This Guide
- Quick Answer: In Progress for Weeks Is Often Normal, Until You Pass the Published Time
- What the Statuses Mean: What DataFlow Publishes and What It Does Not
- How Long DataFlow Takes, Regulator by Regulator
- When the Clock Starts, and What Stops It
- Is Your Case Actually Delayed? A Five-Minute Check
- Why DataFlow Cases Stall: The Causes, Most Fixable First
- What to Do When It Is Delayed: Escalation Step by Step
- Want Someone Else to Chase It? The Desk Takes the Stuck Case
- What a Delay Can Cost You, and What It Should Not
- Express Service and Premium Help: What They Change and What They Do Not
- How the Report Reaches Your Regulator
- What to Tell Your Employer While You Wait
- After the Report Is Finished: The Next Clocks
- Mistakes That Make a Slow Case Slower
- Real-Life Scenarios
- Need It Sorted? The Desk Chases DataFlow for You
Quick Answer: In Progress for Weeks Is Often Normal, Until You Pass the Published Time
A DataFlow case that shows in progress or under review for three to five weeks is usually still inside DataFlow's own published time, which is 15 to 25 working days from payment and a complete set of documents. It counts as delayed only once you pass that time for your regulator, counted from the day the last document went in, and then the fix is one clear ticket to the DataFlow Support Centre with your case number, not a new case.
Working days are not calendar days, so 25 working days is roughly five to six calendar weeks. DHA's Sheryan FAQ gives 15 working days for a new report and 5 for a transferred one. DataFlow's Abu Dhabi guide gives 25 working days standard and 14 with Express. Most "stuck" cases we see are waiting on an issuing university or hospital, or on a missing item from the applicant. This guide shows how to tell which, how to escalate, and what to tell your employer. Figures checked November 2026.
If your report has already come back as Discrepancy or Unable to Verify, that is a different problem with its own deadline. Read DataFlow Discrepancy or Unable to Verify: the appeal instead.
What the Statuses Mean: What DataFlow Publishes and What It Does Not
Applicants want a glossary of every status word. DataFlow does not publish one. Its FAQ says the status page gives visibility on the status of each document, and its Abu Dhabi guide gives "Under Review" as an example of a document status. The final results are defined by the regulators. Here is what each word you are likely to see can and cannot tell you, checked against DataFlow's FAQ, DataFlow's How to Apply guides for DHA and DOH, DHA's licensing manual and DOH's Licensing Procedure Manual in November 2026.
| What you see | Where the meaning comes from | What it tells you | What to do |
|---|---|---|---|
| Confirmation email with a case number | DataFlow FAQ: an automatic email from [email protected] after payment | The application was submitted and paid | Save the case number. If you paid and got no email, raise a support request |
| In progress, under review, or a similar word against a document | DataFlow's DOH guide uses "Under Review" as an example. No public definition of each in-progress word | DataFlow is still working on that document, usually waiting for the issuer | Nothing until your published time passes, unless DataFlow asked you for something |
| A request for more documents or information | DataFlow FAQ: some issuers ask for specific extra items, and an associate contacts you | The case cannot finish until you answer | Answer the same day. Late items can add fees and delay the report |
| A document flagged for re-upload | DataFlow's DOH guide: unclear or incorrect files, such as a blurry passport scan, are flagged; payment is not affected | A scan was rejected | Upload a clear, uncropped scan of the original |
| Completed, report ready | DataFlow FAQ: email notification, and the final report is shared with your regulator | The work is done | Check that the regulator can see it. See the section on how the report reaches the regulator |
| Positive | DOH: all submitted credentials verified successfully | A clean report | Move to the regulator's next step |
| Unable to Verify or Discrepancy | DHA's manual lists Positive, Unable to Verify and Discrepancy as the possible outcomes | The case is finished, not delayed | Follow the appeal guide; the clock for an appeal has started |
Two practical points. First, statuses are shown per document. Your degree can be finished while an old employer is still open, and the report waits for the slowest component. Second, DataFlow moved applicants to a new platform, and the cutoff date depends on the regulator. Its DHA page sends applications made on or before 31 August 2024 to dataflowstatus.com. Its SCFHS FAQ uses 10 March 2026: older SCFHS cases are checked at dataflowstatus.com with the case number and passport number, newer ones by logging in to your DataFlow account. If you look in the wrong place, the case can look frozen when it is not.
How Long DataFlow Takes, Regulator by Regulator
The number that matters is the one published for your regulator. These are the official figures we found in November 2026. Where a regulator publishes nothing, we say so.
| Regulator | Published time for the report | Source |
|---|---|---|
| Any regulator (DataFlow's general figure) | Usually 15 to 25 working days from payment and a complete set of documents | DataFlow FAQ |
| DHA (Dubai) | 15 working days for a new report from the payment date; 5 working days to transfer an existing report | DHA Sheryan FAQ |
| DOH (Abu Dhabi) | 25 working days standard, 14 with Express, both from payment and complete documents. DOH's own 2024 manual gives 24 working days | DataFlow DOH How to Apply guide; DOH Licensing Procedure Manual |
| SCFHS (Saudi Arabia) | An average of 25 working days, or 14 with Express. Averages, not a guarantee | DataFlow SCFHS reference kit, as set out in our DataFlow for SCFHS guide |
| OMSB (Oman) | Up to 25 working days | OMSB's DataFlow information page |
| MOHAP (northern emirates) | Not published on MOHAP's evaluation service page. Use DataFlow's general figure | MOHAP service card |
| DHP (Qatar) | Not published. DHP's verification page names its approved providers but gives no time | DHP Primary Source Verification page |
| NHRA (Bahrain) | Not published in NHRA's application checklist | NHRA new licence checklist for non-Bahrainis |
The regulator's own review comes after the report and is a separate clock. DHA's Get Registered review is 5 working days and costs AED 200 once the report is linked, as set out in our DHA result guide. DOH reviews in 5 working days. Qatar's DHP guideline for nurses gives 15 working days for the evaluation, starting from the date the requirements are complete. Do not add these to the DataFlow time and call the total "DataFlow".
When the Clock Starts, and What Stops It
Most people count from the day they paid. DataFlow counts from the day it had everything. Its FAQ says the 15 to 25 working days run "from the date of payment and submission of a complete set of documents". Its Express page says working days do not include days spent waiting for information from you because your data was incomplete or insufficient.
- The clock starts when you have paid and every required document and detail is in.
- The clock pauses, in practice, while DataFlow waits for you. If an associate asked for an extra document on day 6 and you replied on day 16, you have lost those ten days.
- The clock does not cover the issuer's silence in any guaranteed way. DataFlow lists a late response from issuing authorities as a cause of delay. Its Express refund policy names no response from issuing authorities and regional conflict as examples of unavoidable delay.
- Late additions cost money. DataFlow's SCFHS FAQ says anything submitted at a later stage is subject to additional fees and will delay the final report.
- Some issuers charge their own fee. DataFlow says the details appear when you select the issuer, with instructions on whether you pay through DataFlow or directly. An unpaid issuer fee can hold a component open.
"Working day" is not defined on DataFlow's public pages, and DataFlow does not say whose weekends and public holidays it uses. Count Monday to Friday as a rough guide and allow for public holidays in both the UAE and the issuer's country.
Is Your Case Actually Delayed? A Five-Minute Check
Before you chase anyone, do this check. It tells you whether to wait, to act, or to escalate.
- Find the start date. Use the date of payment, or the date you uploaded the last requested document if that was later. Your confirmation email and any DataFlow request emails show these.
- Find your regulator's number in the table above. If it is not published, use 25 working days.
- Count working days from the start date to today.
- Open the case in the right place: your DataFlow account for newer applications, dataflowstatus.com for older ones (the cutoff is 31 August 2024 on DataFlow's DHA page and 10 March 2026 for SCFHS). Read the status of every document, not just the headline.
- Check your email and spam folder for any request from DataFlow you have not answered. If there is one, the case is waiting for you, not delayed.
| Result of the check | What it means | Action |
|---|---|---|
| Under the published time, nothing asked of you | Normal | Wait. Tell the employer the expected date |
| Under the published time, a request is open | Waiting for you | Answer today, then restart your count |
| Over the published time, nothing asked of you | Delayed, usually at the issuer | Raise one support ticket. See the escalation steps below |
| Over by a lot, one component still open | One issuer is not answering | Ticket plus your own contact with the issuer |
| Status says finished, regulator says no report | A linking or addressing problem, not a DataFlow delay | See how the report reaches the regulator |
Why DataFlow Cases Stall: The Causes, Most Fixable First
DataFlow publishes the causes of delay but not how often each happens. The order below is by how easy each is for you to fix.
1. Something is missing from you
An unanswered request is the quickest fix and the most common reason a case seems frozen. DataFlow's FAQ says an associate will contact you for any additional requirements. Answer by the same channel and keep a screenshot.
2. Your account details do not match the regulator's records
DataFlow's DHA guide asks you to register with exactly the same details you used on Sheryan, including your DHA ID. Its DOH guide says you must use the same email linked to your TAMM UIN, and warns that mismatched details could delay the application or require you to start over. If your name differs between documents, see our guide to name mismatches across passport, degree and licence.
3. A manually signed letter of authorisation is needed
Some issuers want a hand-signed authorisation letter rather than the online consent. DataFlow's SCFHS FAQ says an associate will contact you to arrange it if you have not provided one.
4. The issuer has its own fee or its own process
Some universities and councils charge to release a verification. Until that fee is settled, that document can stay open.
5. The issuer is slow, closed or unreachable
DataFlow names late responses from issuing authorities and events such as conflicts, strikes and natural disasters. An old employer that has closed or a hospital whose HR team does not reply can hold one component for weeks. If it ends as Unable to Verify, the appeal guide explains the next step.
6. You verified the wrong documents for your title
DataFlow tells SCFHS applicants to check their classification on Mumaris Plus first and verify what SCFHS will actually classify them on. For the UAE, DataFlow's DOH guide points to the PQR for the right documents. A report that verifies the wrong degree is finished on time but useless, and adding a document later costs extra.
What to Do When It Is Delayed: Escalation Step by Step
Once your check shows you are past the published time with nothing asked of you, escalate in this order. One clear message to the right channel is better than many messages to every channel.
- Collect your details. DataFlow case number or reference number, your passport number, the regulator, the start date, the component that is still open, and the date of any request you answered.
- Raise one ticket in the DataFlow Support Centre at support.dataflowgroup.com, quoting your case number. On the new platform, DataFlow also lets you raise a request from inside your account. Ask three things: which component is open, what DataFlow is waiting for, and the expected completion date.
- Use the regulator-specific support line if there is one. For SCFHS, DataFlow lists [email protected] and +966 114 869 142. For DOH, the DOH Licensing Procedure Manual lists DataFlow on +971 2 6350455 extension 327 or +971 4 2475900. DataFlow also lists WhatsApp on +971 50 349 4337. In Doha, DHP's verification page lists DataFlow's office in Barwa Tower 1, Sunday to Thursday, 8 am to 4 pm.
- Help the issuer answer. If one university or employer is holding the case, contact its registrar or HR office yourself, give them DataFlow's request reference if you have it, and ask them to reply to DataFlow. This is our practical advice, not a DataFlow instruction, and it often moves a stuck component.
- Write down every contact. Date, channel, the name of the person and what they said. If the case ends as Unable to Verify, this record supports an appeal.
- Do not open a second case for the same documents. You pay twice and the issuer gets two requests. If DataFlow asks for an additional document, follow its instruction for that.
- Tell the regulator only what it needs. Regulators read the final report and do not chase DataFlow for you. SCFHS's Mumaris Plus FAQ, asked about a delayed report, tells applicants to refer to DataFlow because the final report must be attached.
DataFlow does not publish a response time for support tickets or a formal escalation level above the ticket. If a week passes with no answer, reply on the same ticket rather than opening a new one, so the history stays in one place.
Want Someone Else to Chase It? The Desk Takes the Stuck Case
A case that is past its time usually needs three people pushed at once: DataFlow, the issuer and your employer. The Wathim healthcare licensing desk takes that over. It reads your DataFlow case with you, works out which component is holding the report and why, raises and follows the ticket, contacts the university or old employer to get the answer sent, and keeps your new employer informed in writing so the job offer is not lost to silence.
The fee is fixed and agreed before any work starts, and a real person replies within 24 hours. The desk cannot make an issuer answer and does not promise a date that DataFlow has not given. Send the desk your case number and regulator and say how long it has been open.
What a Delay Can Cost You, and What It Should Not
Waiting longer does not, by itself, cost more. The money goes on extras you add while you wait. These are the official figures we found, checked November 2026.
| Item | Cost | Source |
|---|---|---|
| DOH verification package | AED 1,260 general physicians and dentists, AED 1,680 specialists and consultants, AED 990 other categories | DOH Licensing Procedure Manual (2024) |
| SCFHS verification package | SAR 600 doctors and dentists, SAR 500 nurses, pharmacists and allied health | Our DataFlow for SCFHS guide |
| An extra document added later (SCFHS) | SAR 300 | Same guide |
| Documents submitted after the application | "Additional fees", amount not published | DataFlow SCFHS FAQ |
| Issuer's own release fee | Set by the issuer, shown when you select it | DataFlow SCFHS FAQ |
| SMS progress updates (SCFHS) | SAR 9.75 | Our SCFHS guide |
| Transfer of another authority's report to DHA | AED 300, up to 5 working days | DHA Sheryan FAQ |
| DHA Get Registered review after the report | AED 200, 5 working days | Our DHA result guide |
DHA's FAQ says DataFlow fees are listed on DHA's licensing fees page; the DHA FAQ itself does not print the DataFlow package price for Dubai, so check it on the DataFlow portal before you pay. Two costs are avoidable: a second case for the same documents, and a missed exam booking because you planned on a hoped-for date. Refund rules for stopped or closed cases are in the appeal and refund guide.
Express Service and Premium Help: What They Change and What They Do Not
DataFlow sells faster processing and extra help, but they work differently from what many applicants expect.
| Service | What DataFlow says it does | Price |
|---|---|---|
| Express | Expedites verification to within 14 working days, with a specialist assigned. Chosen when you apply, not afterwards | Added to the package fee. For SCFHS, SAR 500 |
| Express Assist (SCFHS) | Applicant Assist plus Express | SAR 650 |
| Applicant Assist | One-to-one support by video call, audio call and email | USD 42 |
| VIP Assistance | A dedicated relationship manager for 3 months, with WhatsApp support | USD 210 |
| Platinum Onsite (UAE only) | In-person, phone and email support, with a helpdesk at Dubai Healthcare City | USD 142 |
| Platinum Doorstep (UAE only) | Platinum Onsite plus document collection from any location in Dubai | USD 572 |
Prices are from DataFlow's Premium Services page and our SCFHS guide, checked November 2026. DataFlow's blog says Express and Express Assist are available only for a few regulators, so check the drop-down when you apply.
- Express is chosen at application. DataFlow's Express page says you select it in the application form alongside your package. It does not describe adding Express to a case already running.
- There is a refund policy for Express delays. DataFlow says applications delayed beyond 14 working days can be investigated for a refund if you raise a support ticket. Days waiting for your information do not count, and the page names issuer silence and regional conflict as unavoidable delays.
- Help services do not speed the issuer. Applicant Assist, VIP and Platinum change how much support you get. None of DataFlow's pages says they shorten verification.
How the Report Reaches Your Regulator
DataFlow's FAQ says that when a case is complete it emails you and shares the final report with your regulator. What happens next differs by regulator, and this is where many "delays" really sit.
| Regulator | How the report is used | If the regulator cannot see it |
|---|---|---|
| DHA | Linked electronically to your registration application in Sheryan. Get Registered cannot be processed until the report is complete | If verified documents do not appear under Verifications and CBT Assessments, apply for a transfer on DataFlow. DHA's FAQ says up to 5 working days, free for DHA reports issued after 2017 |
| DOH | Reviewed as the final credentialing step on your TAMM application | DOH accepts only reports addressed to DOH. A report addressed to DHA or MOHAP needs re-issuance to DOH, and documents can be added at the same time |
| MOHAP | MOHAP asks for unprotected copies of all previous DataFlow reports with the evaluation | Download your report from your account and upload it |
| SCFHS | The final report must be attached for classification | Follow up with DataFlow; SCFHS refers you there |
| DHP (Qatar) | Request verification first, then attach the report to the online evaluation application | Download the report and attach it; DHP's guideline says it is reviewed at evaluation |
| NHRA | Report from DataFlow or Quadrabay covering all qualifications, full experience, good standing and licence | Ask the provider to confirm the report was issued to NHRA |
| OMSB | DataFlow provides OMSB with the report | OMSB's certificate equivalency team: [email protected] |
DHA's FAQ also says PSV reports have no validity date and new documents are added to an existing report, while documents checked before may need re-verification. If you already hold a report for another authority, a transfer is quicker than a new case: 5 working days for DHA against 15. DHA charges AED 300 for a transfer from another authority's report.
What to Tell Your Employer While You Wait
A new employer usually cares about one thing: when can you start. Silence makes them assume the worst. A short written update protects the offer.
- Give them the published time, not a guess. "DataFlow publishes 15 working days for a new DHA report. My case was complete on 4 September, so the expected date is about 25 September."
- Say which part is open. "The degree is verified. My previous hospital's HR office has not yet replied."
- Say what you are doing. "I raised a DataFlow ticket on 26 September and have written to the hospital's HR office."
- Ask about the offer's long-stop date. Some offers lapse if the licence is not issued by a date. Ask for it in writing and ask whether it can be extended.
- Do not start work early. A finished report is not a licence. Read why you must not practise before the licence is active.
Many facilities in the UAE file the licence for you once the report is ready. In Abu Dhabi, DOH's manual lets either the professional or the facility representative apply on TAMM, and DataFlow has a separate guide for facility PROs. Agree in writing who is following the DataFlow case, so it is not left to nobody.
After the Report Is Finished: The Next Clocks
When DataFlow finishes, the licence is still a few steps away. Know them so you can plan.
- Dubai. Link the report in Get Registered, pay AED 200, and DHA reviews in 5 working days. If your title needs the exam, the DHA exam pattern and DHA exam fees guides cover it. DHA's manual says PSV and the computer-based test can run at the same time. The registration then has to be activated by a facility; see licence approved but not activated.
- Abu Dhabi. DOH reviews in 5 working days, then the exam if required. See the DOH licensing exam guide.
- Saudi Arabia. Attach the report to classification. See SCFHS classification and registration and the Mumaris Plus eligibility number guide.
- Qatar. Attach the report to the evaluation. Exam rules are in the DHP qualifying exam guide.
- Bahrain. The report is part of the new licence file. See the NHRA licensure exam guide.
If you booked a Prometric date that now falls before your report will be ready, check the rescheduling rules before the deadline passes: Prometric cancellation and rescheduling.
Mistakes That Make a Slow Case Slower
- Counting from the payment date when a document went in later. You will chase too early and annoy the people you need.
- Missing a DataFlow request in spam. The case waits for you, and those days do not count against DataFlow.
- Opening a new case for the same documents. You pay again and confuse the issuer.
- Checking the old status site for a new application. Newer applications are followed in your DataFlow account; the cutoff date depends on your regulator.
- Registering with details that differ from Sheryan or TAMM. DataFlow warns this can delay the case or force a restart.
- Verifying documents for the wrong title. Check the PQR or your SCFHS classification first.
- Asking the regulator to chase DataFlow. Regulators wait for the report; DataFlow and the issuer are the ones to push.
- Buying a help service to speed up the issuer. Only Express targets speed, and only when chosen at application.
- Using an unknown agent who will not share your case number. Without it you cannot check your own case.
- Booking a non-refundable exam or flight on a hoped-for date. Plan on the published time plus a margin.
Real-Life Scenarios
A nurse for Dubai, five weeks "in progress"
She paid on 1 September but uploaded her experience letter on 12 September after DataFlow asked for it. DHA's figure is 15 working days, so her start date is the 12th, not the 1st. She is not late yet. She tells her employer the expected date in writing and waits.
A GP for Abu Dhabi, one hospital not answering
Day 30 of a 25-day standard case. The degree and licence are done; one former hospital is open. He raises a ticket, calls the DOH line DataFlow lists, and emails the hospital's HR office asking them to reply to DataFlow. He keeps a log in case the component ends as Unable to Verify.
A pharmacist for Saudi Arabia who chose Express
Day 17, Express case, nothing asked of her. Express aims for 14 working days and DataFlow has a refund policy for Express delays. She raises a ticket asking for the open component and for the delay to be investigated under that policy.
A physiotherapist whose report is finished but DHA cannot see it
The report was issued for MOHAP two years ago. It does not appear in his Sheryan account. He applies for a transfer on DataFlow, which DHA says takes up to 5 working days, then links it to Get Registered.
A dentist whose agent will not give the case number
She cannot check anything. She asks the agent for the case number and the passport number used. If they refuse, she contacts DataFlow Support with her passport number and the regulator to find the case.
Need It Sorted? The Desk Chases DataFlow for You
If your case is past its published time, or you cannot tell whether it is, the Wathim healthcare licensing desk takes it over end to end. It reads every component, answers any open request with you, raises and follows the DataFlow ticket, works on the issuer that has gone quiet, makes sure the finished report reaches DHA, DOH, SCFHS, DHP or NHRA, and then files the licence application so nothing stops at the next step. One case manager owns the file.
The desk fee is fixed and agreed before work starts, and you get a reply within 24 hours. It does not change documents and cannot force an issuer to answer. Brief the desk with your case number, regulator and start date. Country routes: healthcare licensing, UAE, Saudi Arabia, Qatar, Bahrain, Oman and Kuwait.
Frequently Asked Questions
DataFlow's FAQ says usually 15 to 25 working days from payment and a complete set of documents. DHA's Sheryan FAQ gives 15 working days for a new report and 5 for a transfer. DataFlow's DOH guide gives 25 working days standard and 14 with Express, and OMSB says up to 25 working days.
DataFlow does not publish a definition for each in-progress status. It shows the status of each document, and its DOH guide uses Under Review as an example. In practice it means DataFlow is still working on that document, usually waiting for the issuing university, employer or council.
Not necessarily. Count working days from the day your last document went in, not from payment, and compare with your regulator's published time. If you are past it and DataFlow has not asked you for anything, raise one ticket in the DataFlow Support Centre with your case number.
Raise a ticket at support.dataflowgroup.com quoting your case number, or from inside your DataFlow account if your case is on the new platform. DataFlow also lists WhatsApp on +971 50 349 4337, and for SCFHS cases [email protected] and +966 114 869 142.
DataFlow's Express page says you choose Express in the application form alongside your package. It does not describe adding it later, so ask Support before you assume it is possible.
Yes, in effect. DataFlow's time runs from a complete set of documents, and its Express page says days spent waiting for your information do not count as working days. Late documents can also add fees.
They do not say they can. SCFHS tells applicants with a delayed report to refer to DataFlow, because the final report must be attached. Chase DataFlow and the issuer, not the regulator.
DHA's FAQ says that if verified documents do not appear in Sheryan, you apply for a transfer on DataFlow. It takes up to 5 working days and is free for DHA reports issued after 2017. A report from another authority costs AED 300 to transfer.
Older cases are checked at dataflowstatus.com with your case number and passport number; newer ones in your DataFlow account. The cutoff depends on the regulator: DataFlow's DHA page uses 31 August 2024, and its SCFHS FAQ uses 10 March 2026.
No. A second case for the same documents costs a second fee and sends the issuer two requests. Raise a ticket on the existing case. If the case finishes as Unable to Verify, use the appeal route instead.
Stuck on a Government Service Step?
Wathim publishes free plain-English guides to GCC visas, IDs, driving licences, attestation, and fines. If a fee table looks off or a step is missing, tell us and we will update the guide. You can also book a free guidance call with our GCC services desk.
Wathim Editorial
GCC Healthcare Licensing Desk
The Wathim team writes plain-English guides to GCC government services. We track ICP, GDRFA, MOHRE, Absher, Muqeem, Qiwa, Metrash, LMRA, ROP Oman, and MOI Kuwait so expats can plan visa, residency, ID, and licence steps without guesswork.