On this page
Quick answer
Abu Dhabi facilities are licensed by the Department of Health (DoH) through the TAMM portal, using UAE Pass. DoH's Standard for Healthcare Facility Licensure (version 6, published June 2025, effective September 2025) sets two steps:
| Step | DoH target time | What it gives you |
|---|---|---|
| Preliminary approval | 20 working days | The right to build and fit out, and to register staff. Valid 6 months. |
| Permanent licence | 25 working days | The right to receive and treat patients. |
The standard tells you to pay the application fee and the final licensing fees but does not list amounts. TAMM shows them when you pay, so get the figure from TAMM for your facility type before you budget, not from a setup website.
Checked on 20 November 2026 against the DoH standard (read from an archived copy, because doh.gov.ae blocks automated access) and DoH's investor pages.
The exam step for your clinical staff
Next step: the exam. DoH requires every clinician in the facility to hold a DoH licence, and you register them once you hold the preliminary approval. Most doctors, nurses and allied staff new to Abu Dhabi sit the DoH licensing exam, booked with Pearson VUE, unless an exemption applies. Read the DOH licensing exam guide for the format, fees and attempts, and the DOH licence for nurses if you are hiring nurses.
Step 1: preliminary approval
- Get a valid trade name certificate from the Department of Economic Development.
- Create the facility account on TAMM with UAE Pass, and request Public Relation Officer (PRO) access for a new medical or pharmaceutical facility.
- Submit the request for preliminary approval and pay the application fee.
- Receive the decision by email and print the certificate.
During the preliminary approval you may not receive or treat patients, or promote or advertise services. You may register medical staff (after requesting Super PRO access), change owners, facility type, specialties, services, beds, internal plan or title, and extend or cancel the approval.
When DoH can withdraw it
- You do not apply for an extension through TAMM in time.
- You do not send the periodic progress reports.
- Your project is less than 10% complete 6 months after approval.
How long you can extend
Every preliminary approval starts at 6 months. You can apply to extend from 2 months before expiry, with a completion report, the reasons for delay and the consultant's report for new construction. The maximum depends on the facility:
| Facility | Building | Maximum with extensions |
|---|---|---|
| Clinic (general, specialised, general or specialised dental) | Dedicated building | 18 months |
| Telemedicine and virtual clinics | Dedicated building | 18 months |
| Home care service | Dedicated building | 18 months |
| Centres (one day surgery, primary care, medical, dental, IVF, dialysis, stem cell) | Dedicated building / new construction | 2 years / 3 years |
| Hospitals and nursing homes | Dedicated building / new construction | 3 years / 5 years |
Step 2: the permanent licence
- Engineering drawings. Hospitals, one day surgery, fertility, dialysis, diagnostic, imaging and lab, and oncology centres must use a DoH pre-qualified consultant. Other facilities choose DoH in the consultant list, and DoH's planning section reviews and stamps the drawings.
- 90% inspection. Hospitals, one day surgery, fertility, dialysis and oncology use a pre-qualified consultant for it.
- Documents: medical malpractice insurance contract, pest control contract and a valid DED trade licence. Contracts must run for 13 months to cover the licence period.
- Approvals from the Monitor and Control Center (MCC) and from Malaffi, Abu Dhabi's health information exchange.
- 100% inspection of each specialty, service or bed type you want active, with the related professionals in place. Suspend anything not ready rather than fail on it.
- Pay the final licensing fees and print the permanent licence.
Renewal, closures and changes
- Renewal opens 2 months before expiry. From 30 days after expiry DoH charges 25% of the licence fee per month, for up to 6 months. A facility in the health insurance system also pays AED 10,000 a month for late insurance renewal, for up to 6 months. Six months after expiry the licence is cancelled by law.
- You can renew for one or two years; two years needs a successful Health Quality inspection.
- Temporary closure is approved automatically for the first 6 months for most facility types (not hospitals or home care), and closure does not stop you renewing.
- Changing the primary owners recorded at preliminary approval is charged as a new facility licence; adding or removing secondary owners is free.
- The medical director, facility director, PRO and pharmacist in charge must be kept up to date on the facility profile.
- Facilities must meet their Tawteen (Emiratisation) targets under DoH circulars, and the ADHICS cyber security standard.
Opening elsewhere in the UAE
Dubai uses DHA (open a clinic in Dubai), Sharjah uses SHA (SHA facility licence) and Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah use MOHAP (MOHAP facility licence).
Need it sorted? How the Wathim desk helps
The desk handles the DoH licence files for the staff your facility registers: the exact title under the PQR, Dataflow, the Pearson VUE exam booking and the licence application your facility links on TAMM. One case manager follows your file, the fee is fixed before work starts, and a real person replies within 24 hours.
Send your facility type, team and target date: brief the desk. For the regulator see the DOH page, and for renewals see an expired DOH licence.
Frequently asked questions
DoH's licensure standard does not publish the amounts. TAMM shows the application fee and the final licensing fee for your facility type when you pay. Ask for the TAMM figure before you budget.
DoH's target is 20 working days. The approval is valid for 6 months and can be extended up to 18 months for a clinic in a dedicated building.
No. During the preliminary approval the facility may not receive or treat patients, or advertise health services. It may register staff.
25% of the licence fee for each month, starting 30 days after expiry, for up to 6 months. Facilities in the insurance system pay AED 10,000 a month for late insurance renewal. After 6 months the licence is cancelled.
DoH's targets are 20 working days for the preliminary approval and 25 for the permanent licence, 45 in all. Fit-out, staff licensing and inspections come on top of that.
Yes. Both are TAMM services. The name must match the trade name in Arabic and English, and the owner name must match the Emirates ID. Changing a primary owner is charged as a new facility licence.
The regulator behind this
Checked against the official sources
Every fee, step and rule on this page comes from these 2 official pages.